Bee Gee Palm Village

Location Address : Sector 126 Mohali, Mohali

offers Get exclusive special offers for last 25 buyers.
Starting Base Price On Request
Masterplan
Floor Plan
Siteplan
3 BHK Residential Property
EMI Start at

Status: Ready to Move

  • Apartment Sizes Ranges in Between 2180 sqft - 2180 sqft.
  • Total Units & Towers: 336 Units & Towers
  • Total Project Area: Acres
  • Possession: Possession February, 2019
  • Rera:

Overview of Bee Gee Palm Village

Bee Gee Palm Village by Bee Gee Builtech at sector 126 mohali making headlines in the Ready to Move projects segment in mohali for the various meticulously Residential options. the Bee Gee Palm Village is a Ready to Move apartment project, which offers 3 bhk options with the size range between 2180 sqft - 2180 sqft. this project by Bee Gee Builtech is conveniently priced starting from On Request-On Request and is ideally located to ensure comfort and a higher living quotient for its buyers.

the Bee Gee Palm Village offers Residential apartment 336 units with top-class specifications that meet the expectations of the lifestyle of the urban population, it is spread across the Acres of land. Bee Gee Palm Village location has excellent connectivity with major part of the mohali & it is located at the heart of the sector 126. the amenities at Bee Gee Palm Village include a fully equipped clubhouse, gardens, gymnasium, swimming pool, outdoor activity, and children’s play area with utmost importance to state-of-the-art 24/7 security.

Price List for The Bee Gee Palm Village

Bee Gee Palm Village Floor Plan
3 BHK

Saleable Area : 2180 Sq. Ft.

call

EMI starting:

Bee Gee Palm Village Specifications

FOUNDATION
FOUNDATION

Column foundation RCC plinth beam all around CC brick/red brick of 9 inch external and 4 1/2 inch internal walls.

STRUCTURE
STRUCTURE

Reinforced concrete framed structure with columns and beams External wall with 9" thick brick work.

FLOORING
FLOORING

1'x1' Vitrified tiles for all rooms or similar Ceramic non-slippery tile flooring for bathroom, balcony and service areas .

KITCHEN
KITCHEN

2' 0" Wall dado SS sink Polished Granite Kitchen top Stainless Steel Sink Provision for aqua guard.

ELECTRICALS
ELECTRICALS

Concealed copper wiring with three phase supply,and individual meter and necessary MCB with ISOLATOR in the DB inside the flat.



WATER SUPPLY
WATER SUPPLY

Bore well to sufficient Depth Metro water through under ground RCC sump RCC overhead tank.

Know About Localities of Bee Gee Palm Village in Sector 126

Location

Sector 126, Mohali

0% Livibility score
AOC is searching fo you …

Properties Price Trend in Sector 126

addverstor

Similar Properties to Bee Gee Palm Village in Sector 126

About Bee Gee Builtech Projects and Developers

Bee Gee Builtech
  • 54 Years of Experience
  • 1 Total Projects
  • 0 Ongoing Projects

....Read More

Bee Gee Palm Village Project’s Reviews & Ratings

Rating

Frequently Asked Questions

Q:Where is the exact location of Bee Gee Palm Village ?
A: The project is located in Sector 126 ,Mohali INDIA.
Q: What is the total area of Hiranandani The Evita?
A: The total area of project is N/A
Q: Is parking facility available in the Bee Gee Palm Village ?
A: Yes, Parking facility is available in this project.
Q: Which banks are associated with Bee Gee Palm Village ?
A: Banks associated with this project are SBI, ICICI Bank, HDFC Bank, AXIS BANK, CANARA BANK, PNB HOME LOAN, TATA CAPITAL, RELIANCE HOME, DHFL
Q:What is the project status and possession date of Bee Gee Palm Village ?
A: The possession status of Bee Gee Palm Village is Ready to Move and is available for possession from February 19.
Q: How much is total number of units in Bee Gee Palm Village ?
A: Total units in this project are 336.
Q: How much is the area of 3 BHK floor plan in Bee Gee Palm Village ?
A: The area of project for 3 BHK is 2180 Sq ft.
Q: What is the price of 5 BHK Apartment/Flat in Bee Gee Palm Village ?
A: Price for 3 BHK Apartment/Flat in this project is starting from